| 10:00 AM |
Introductions and Review of
Agenda (60k Word) |
| 10:05 AM |
Overview of the Forum's
Work Plan (30k Excel) for 2009 (John Fazio)
- Summary (50k Word) of the six technical work groups
- GENESYS model enhancements
|
| 10:30 AM |
Hydro Peaking Capacity (470k PowerPoint) Work Group (Mary Johannis, Don Long)
- Update on Trapezoidal vs. HOSS hydro peaking capacity
- Regional sustained hydro peaking capacity contract -
Phase I (120k PDF)
- Decision Item: To proceed with Phase II to implement Phase I work plan
|
| 11:30 AM |
LOLP Definition (140k Power Point) Work Group (Fazio, Johannis)
- Overview of LOLP methodologies (30k Word) across NERC
- Decision Item: To consider replacing the curtailment thresholds (used for the LOLP calculation) with a generic contingency resource (to reflect resources not modeled in GENESYS
|
| 12:00 PM |
Lunch |
| 1:00 PM |
Data Validation (60k PDF) Work Groups (Dick Adams)
- Load forecasts and conservation
- Generating resources
|
| 2:00 PM |
Benchmarking Work Group (John Fazio)
|
| 2:30 PM |
Wind
Assessment (2.5 Power Point) Work Group (Johannis)
- Correlation between wind generation and temperature
- Developing a long-term synthetic wind generation data set
|
| 3:00 PM |
Schedule Next Meeting
|